HPT

 

9.0 Infrastructure Materials, Construction and Maintenance:

9.6Re-coating, Resurfacing:

The Company estimates that the Grid Rail will require painting or coating every six (6) to twelve (12) years and resurfacing every ten (10) to fifteen (15) years. Grid Columns are expected to need replacement or major repair every seventy-five (75) years.