HPT

 

7.0 Proximity and Land Requirements:

7.1Air Rights:

In order for the HPR System to be cost effective, it must be constructed mostly above existing local, state and federal roadways where air rights may be available. Current railroad right of ways may also be suitable for HPR construction.