HPT

 

17.0 Economics of Hybrid PRT Maglev:

17.4Phase II Backup During Outages:

If, for any reason, the Maglev system failed to operate properly, each Grid vehicle would revert to Phase II control and run on a vehicles Thrust Plate. A failure of the Phase II apparatus would result in Phase I operation. Maglev Hybrid PRT vehicles would be capable of operating on standard highways in the same manner as Phase I or II Hybrid PRT vehicles.